Filters

Changing any of the form inputs will cause the list of events to refresh with the filtered results.

Craft Corner Pre-K

Studio A, Museum of Art, 455 N Main St, Las Cruces, NM, 88001

Watch as your little one expresses their artistic creativity at the all new “Craft Corner Pre-K!” Join us at the Museum of Art at 9am, 10am, or 11am on Thursday, as we read a children’s book and create an art piece with a different topic each month!   Admission to the Museum and this program is FREE.

Land of the People — Piro – Manso – Tiwa Tribe of Pueblo of San Juan de Guadalupe–EXHIBIT CLOSING

Branigan Cultural Center (Museum), Branigan Cultural Center (Museum), 501 N Main St, Las Cruces, NM, 88001

The fourth featured group in our twelve-week focused exhibit run is the Piro-Manso-Tiwa Indian Tribe, whose exhibit will be displayed from July 18 to October 10, 2026. The Piro-Manso-Tiwa Indian Tribe (PMT) has a long history in the Borderland region, arriving in 1680 after the Spanish forced numerous Indigenous groups south after the Pueblo Revolt.

Neurodivergent Nights

Branigan Cultural Center (Museum), Branigan Cultural Center (Museum), 501 N Main St, Las Cruces, NM, 88001, Museum of Art, Museum of Art, 455 N Main St, Las Cruces, NM, 88001, Museum of Nature and Science, Museum of Nature & Science, 411 N Main St, Las Cruces, NM, 88001

Step into a calmer, more welcoming museum experience with "Neurodivergent Nights," our recurring after-hours program designed especially for neurodivergent visitors and their families.   Enjoy softer lighting, quieter spaces, and engaging activities that let you explore, connect, and create at your own pace---without the crowds.

PHMSA Grant – Gas Pipeline Rehabilitation Project Public Input Meeting

City Hall Room 2007 B - 700 N. Main St. Las Cruces NM 88001

Through state representatives and City Council, the City of Las Cruces Utilities Department (LCU) has obtained a federal grant, utilizing Pipeline and Hazardous Materials Safety Administration (PHMSA) funding to upgrade existing gas pipelines. LCU, together with the City Public Works Department and HDR Engineering, has finalized the design of the gas pipeline rehabilitation and the project went out to bid on May 5, 2026. A-Mountain Construction has been selected as...

Free