Engler Rd and Sonoma Ranch Blvd Traffic Control
Lane closures and shoulder work will take place at the roundabout at Engler Road and Sonoma Ranch Boulevard. The work will start on October 13, 2026, and is expected to be completed by October 23, 2026.
A landscape contractor will be installing irrigation, vegetation, and hardscape.
The traffic control will not affect the Roadrunner Transit.
