The following streets will have a temporary road closures for Micro-Surfacing treatment on the following designated days with No-Parking signs placed along the street at least 24 hours prior to work starting.
Parking will be available on a nearby street.
Access to driveways WILL NOT be allowed between 7 AM – 6 PM.
Depending on weather conditions if your street is not completed on the primary scheduled date, you will be re-notified on a new closure date. If you drive on the new asphalt surface too soon, it will cover your car in oil and will damage the road surface. Please wait until all signs and cones have been removed from the ends of your street before driving your vehicle on the road.
November 10, 2026
Street: From and To
Sunridge Dr
Neptune Dr to Highridge St
Jupiter Rd
Venus St to Mars Ave
Hillsboro Loop
Parkhill Dr to Hillsboro Loop
Arizona Ave
Esperanza St to Solano Dr
Hatfield Rd
Elks Dr to End of Pavement
Desert Dr
Mariposa Dr to Cam Del Rex
Acoma St
Valencia Dr to Palo Verde Ave
For the public’s convenience, crews will work only from 7 a.m. to 6 p.m. leaving the evening free of construction activity. The temporary road closures will not affect the Roadrunner Transit route.
Access to the surrounding residents and business will be maintained. Motorists wanting to avoid any possible delays should seek an alternative route.
